Fit-out planning checklist, 60 key items.

A structured list for a project manager and a tenant's representative. It covers every phase, from drawing up the brief through to handover.

An office fit-out runs dozens of parallel tracks at once - design, engineering, construction, furniture, IT, the move. A point missed early turns into rework or a delay later. This checklist does not replace a project manager, but it helps make sure nothing falls through the cracks.

Phase 1. Brief and requirements

  • Headcount confirmed for move-in day and for two years out.
  • Working pattern set - fixed seating, hot-desking or hybrid.
  • List of zone types drawn up - open space, meeting rooms, phone booths, kitchen, server room, reception, break-out.
  • Number and capacity of meeting rooms decided.
  • Project budget agreed with a breakdown - design, construction, furniture, IT, the move.
  • Target move-in date set and hard deadlines locked in.
  • An internal project lead appointed on the client side.
  • Measured survey and technical file for the space obtained from the landlord.
  • Lease terms clarified - rent-free period, contribution, permission for layout changes.
  • Rules for contractors working in the building agreed (hours, lifts, noise).

Phase 2. Choosing a contractor and design

  • Proposals received from at least three contractors against one shared brief.
  • Contractor's portfolio checked for projects of comparable scale and type.
  • References requested and checked with previous clients.
  • Licences and accreditations verified, where locally required.
  • Contract format agreed - fixed price or open-book costs.
  • Scope of design documentation agreed - architectural, structural, mechanical, plumbing, electrical, low-voltage.
  • Change order process confirmed, with defined response times.
  • Design supervision arranged - who, how often, what gets recorded.
  • Landlord's written approval obtained for the layout.
  • Confirmed whether adapting the sprinkler and fire alarm systems is in the contractor's scope.

Phase 3. Concept and design sign-off

  • Zoning concept signed off by company leadership.
  • Layout checked against evacuation requirements.
  • 3D renders of key zones approved and kept as a reference document.
  • Materials and finishes approved with product codes and manufacturers noted.
  • Logos, fonts and brand colours handed to the designer for wayfinding and branding.
  • Acoustic treatment agreed - partitions, ceilings, flooring.
  • Lighting specification checked - light levels by zone, source type.
  • Privacy zones and requirements defined (sound isolation for meeting rooms).
  • Storage and archiving plan agreed with the team.
  • Accessibility requirements confirmed and built into the design.

Phase 4. Construction and site control

  • Site hoarded off and isolated from any operating tenants in the building.
  • Waste removal plan confirmed (skips, routes).
  • Weekly progress meetings scheduled with minutes recorded.
  • Design changes only go through a signed change order, verbal agreements are not accepted.
  • Concealed work photographed before it is closed up - in-slab electrics, pipework behind walls.
  • Engineering systems (ventilation, cooling, fire) tested before final finishes go in.
  • Furniture delivery scheduled against the construction programme, not before the final clean.
  • IT infrastructure connection (network, cabling, phones) included in the master schedule.
  • Interim sign-off at key milestones recorded formally.
  • Snagging list (punch list) built continuously, not only at final handover.

Phase 5. Furniture and technology

  • Furniture spec finalised and mapped to the floor plan.
  • Manufacturing and delivery lead times confirmed with the supplier, with two to three weeks of buffer.
  • Desk ergonomics, height adjustment and chair support checked against the target headcount.
  • Socket, USB and network port placement matches the final furniture layout.
  • Room booking system selected and integrated with the corporate calendar.
  • AV equipment (screens, video conferencing) tested before the team moves in.
  • Access control programmed - permissions by zone, schedule.
  • Wayfinding and signage installed and legible - entrances, washrooms, meeting rooms, exits.
  • Storage, personal lockers and archive shelving checked against capacity.
  • Office equipment (printers, MFPs) connected and tested before day one.

Phase 6. Handover, the move and operations

  • Final sign-off with the contractor, every punch list item closed or logged with a fix date.
  • Complete as-built documentation received.
  • Warranty documents and manuals for engineering equipment handed over.
  • Operating instructions for systems (ventilation, air conditioning, access control) given to the responsible staff member.
  • Contractor's warranty terms set out in writing, duration, contact person.
  • Move planned floor by floor and team by team, groups relocate in sequence, not all at once.
  • IT equipment moved separately, inventoried before and after.
  • New address communicated to counterparties, banks and government bodies.
  • First 30 days after move-in set aside for collecting feedback on the engineering systems and lighting.
  • Project budget closed, actuals reconciled against plan, variances documented.
An empty boardroom with a long wooden table, white chairs and floor to ceiling windows overlooking the city
Turnkey fit-out

We deliver against every one of the 60 items and you keep control of the result.

We take on project management, construction and design supervision. You get weekly reports and a finished office on time.

Turnkey fit-out
Ready for a project?

Let's talk about your office.

Tell us about the brief. We reply within one business day and offer a free initial consultation.

Message us