The complete guide to office fit-out.

This guide walks through the project from the decision to move through to handover, covering who owns each step, how long it typically takes and where budget and time most often slip.

Fit-out is the complete transformation of a leased or owned space to fit one company's needs. It covers everything from stripping out partitions and running new services to installing furniture and the final clean. Unlike building from scratch, fit-out works within a finished building shell and a fixed lease timeline, and that shapes how the whole project has to be planned.

What a fit-out covers

The scope depends on the starting condition of the space. The market recognises three baseline levels. Shell and core is a bare box with no finishes at all, warm shell adds the landlord's basic services, and CAT A is a finished shell without furniture or partitions. Most business centres in Tashkent hand over space at or close to CAT A, which means the fit-out contractor takes on the internal partitions, flooring, light fittings, branding and everything the team will actually work in.

A typical CAT B fit-out scope includes the following.

  • Stripping out the existing layout and any finishes due for replacement.
  • Internal partitions - glass, plasterboard or demountable systems.
  • Flooring - carpet tile, LVT, timber or epoxy.
  • Ceilings - suspended, stretch or exposed soffits.
  • Lighting for work areas and shared spaces.
  • Kitchens and washrooms, where these fall to the tenant.
  • Low-voltage systems - structured cabling, AV, access control.
  • Furniture, acoustic elements, decor and branding.

The five project phases

1. Strategy and brief

The project starts before a space has even been found. This stage sets out how many desks are needed now and in three years, what working pattern the company runs (fixed seating, hybrid or remote with hot desks), the fit-out budget and the latest acceptable move date. Without this document, any space gets evaluated blind.

2. Finding space and negotiating with the landlord

A good fit-out contractor gets involved in viewings early. They will assess slab heights, the column grid, the location of service risers and how the floor plate can realistically be laid out. This lets a tenant lock in a rent-free fit-out period and pin down exactly what the landlord will provide before the lease is signed.

3. Design

The design goes through several rounds, from layout options through concept to working drawings. The working package covers the architectural design, structural work where needed, the engineering sections (ventilation, cooling, power, data) and specifications for every piece of equipment and furniture. Without a complete working package, the estimate stays inaccurate and expensive changes during construction become unavoidable.

4. Construction and installation

A CAT B fit-out for a 500-2,000 sqm office in Tashkent typically runs 8-22 weeks. The timeline depends on the complexity of the engineering systems, whether glass partitions with a long lead time are involved, furniture deliveries (especially imported items) and how many work fronts run in parallel. The project manager's main job is holding the critical path, flagging risks early and stopping delays caused by decisions nobody signed off on.

5. Handover and fit-out completion

The final stage covers closing the punch list, commissioning the engineering systems, briefing the client's staff and handing over the as-built documentation. A competent contractor backs the completed work with a warranty and sets out the terms of aftercare in writing.

Who is involved

A fit-out project brings together several parties with different interests. Understanding each role helps avoid conflict and delay.

  • The client makes the key decisions and funds the project. Having one person on the business side with sign-off authority for changes matters more than almost anything else.
  • The fit-out contractor runs the whole process from design through to handover and coordinates subcontractors and suppliers.
  • The landlord signs off on any change that affects the structure or the building's shared engineering systems.
  • Subcontractors are the specialist firms covering mechanical, electrical, AV and furniture work.
  • An independent project manager is optional on larger projects above 2,000 sqm and gets engaged when the client wants oversight independent of the contractor.

Where time and money get lost

Reviewing completed projects turns up a handful of recurring causes of overspend. The first is layout changes made after construction has started. Every approved change after work begins costs three to five times what the same decision would have cost on paper. The second is incomplete documentation going out to tender, which leaves a contractor either pricing in a contingency for the unknown or underbidding and raising variations later. The third is ordering furniture and long-lead items late. Glass partitions, made-to-order seating and custom decorative panels need to go on order at the start of the construction phase, not near the end of it.

What to check before choosing a contractor

A portfolio of completed projects at a comparable scale is not optional. Beyond that, check whether the company has its own design team or only builders, how it manages change requests, who will actually run your project and how loaded that person already is. Ask for two or three references from finished projects and talk to them directly.

An empty breakout area with a bench, a bookshelf and a kitchenette beside a glass walled corridor
Turnkey fit-out

Design and construction - one contract.

We run office fit-out projects from the first brief through to handover. One team - architects, engineers, builders and a project manager, with no communication gaps between them.

A fixed price once the working design is signed off, a transparent schedule and a warranty on completed work.